Building Permits

We undertake the processing for any permit needed in your project

Building Permit

In order to obtain a legal building permit, there is a sequence of specific steps set by Public Services. Becodes’s engineers will put through the whole paperwork needed for a permit to be issued – architectural drawings, static studies, mechanical studies etc. Having already adopted the integrated way of design, Becode provides custom made solutions that can satisfy the needs of every client. Working strongly as a team, our employees successfully complete the permission processing.

Operating License

Dealing with permits and licenses affects the preliminary cost deal. Being experienced in issuing licensing for businesses, we prepare the required drawings and documents, and submit them to the corresponding public service.

Illegal buildings legalization

If your building is not-permitted, our team acts quickly, economically and responsibly to help you legalize it. Constant communication with the owner and the below steps we follow bring best results:

  • Violation recording
  • Violation fine
  • Documents gathering
  • Architectural drawings
  • Static checks.